Size: 1685
Comment:
|
Size: 2071
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 40: | Line 40: |
* Mechanical design of limit switch for FR *[[https://www.dropbox.com/s/immtjb7q0h58jme/TF_Yaw-FR%E6%A1%88_20200106.pptx?dl=0|TF Yaw fishing rod]] *[[https://www.dropbox.com/s/3paeep3evuqr51u/TF_V-FR%E6%A1%88_20191203.pptx?dl=0|TF Vertical fishing rod]] *[[https://www.dropbox.com/sh/a7ot4zmc3ous5hr/AAAigoMlrMWEes9P5yv3ora2a?dl=0|3D Models (step file)]] |
|
Line 43: | Line 51: |
* Sato: 15-17 | * Sato: 15-21? |
Agenda/Minutes of the VIS Meeting on 2020/1/10
2020/1/10 14:00 -
Participants:
Progress report
Type-A
Past week report
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM
Past week report
- Glued magnets and standoffs to the mirror and installed the mirror to the suspension.
- Since one magnet was took off during the adjustments of OSEMs, the mirror went to regluing.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
JGW-T2011175 Mirror re-hanging JIG Design review
- Mechanical design of limit switch for FR
Travel Plans
- Travel (Week of 1/13):
- Takahashi:
- Sato: 15-21?
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 1/20):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/1/17(Fri)