Line 40: Line 40:
   * Mechanical design of limit switch for FR
     *[[https://www.dropbox.com/s/immtjb7q0h58jme/TF_Yaw-FR%E6%A1%88_20200106.pptx?dl=0|TF Yaw fishing rod]]
     *[[https://www.dropbox.com/s/3paeep3evuqr51u/TF_V-FR%E6%A1%88_20191203.pptx?dl=0|TF Vertical fishing rod]]
     *[[https://www.dropbox.com/sh/a7ot4zmc3ous5hr/AAAigoMlrMWEes9P5yv3ora2a?dl=0|3D Models (step file)]]



Agenda/Minutes of the VIS Meeting on 2020/1/10

2020/1/10 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • Glued magnets and standoffs to the mirror and installed the mirror to the suspension.
  • Since one magnet was took off during the adjustments of OSEMs, the mirror went to regluing.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

JGW-T2011175 Mirror re-hanging JIG Design review

Travel Plans

  • Travel (Week of 1/13):
    • Takahashi:
    • Sato: 15-21?
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 1/20):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/1/17(Fri)