Line 24: Line 24:
 * PR3 was kicked due to the length control. Health check was done, and we found that PR3 seems to be rubbing a bit. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12396|klog12396]]
  * We will see how it goes with this situation, since there is no problem so far even it is not in a good state.

Agenda/Minutes of the VIS Meeting on 2020/1/10

2020/1/10 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

  • PR3 was kicked due to the length control. Health check was done, and we found that PR3 seems to be rubbing a bit. (klog12396

    • We will see how it goes with this situation, since there is no problem so far even it is not in a good state.

Plan for coming weeks

OMMT & OSTM

Past week report

  • Glued magnets and standoffs to the mirror and installed the mirror to the suspension.
  • Since one magnet was took off during the adjustments of OSEMs, the mirror went to regluing.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 1/13):
    • Takahashi:
    • Sato: 15-21?
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 1/20):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/1/17(Fri)