Agenda/Minutes of the VIS Meeting on 2020/1/10
2020/1/10 14:00 -
Participants:
Progress report
Type-A
Past week report
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
PR3 was kicked due to the length control. Health check was done, and we found that PR3 seems to be rubbing a bit. (klog12396
- We will see how it goes with this situation, since there is no problem so far even it is not in a good state.
Plan for coming weeks
OMMT & OSTM
Past week report
- Glued magnets and standoffs to the mirror and installed the mirror to the suspension.
- Since one magnet was took off during the adjustments of OSEMs, the mirror went to regluing.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
- Mechanical design of limit switch for FR
Travel Plans
- Travel (Week of 1/13):
- Takahashi:
- Sato: 15-21?
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 1/20):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/1/17(Fri)