Differences between revisions 9 and 10
Revision 9 as of 2020-01-17 11:17:04
Size: 2101
Editor: KokiOkutomi
Comment:
Revision 10 as of 2020-01-17 11:22:12
Size: 3033
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/1/17 14:00 -  2020/1/17 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 17: Line 17:
Line 33: Line 32:
 * Okutomi-san and Yamamoto-kun modified the SRM payload sampling rate (from 4 kHz to 16 kHz) in order to make it compatible with the main interferometer control scheme.
 * Tomura-san disabled all the SRM coil drivers hardware watchdogs.
 * Fabian worked in the design of oplev cases. Akutsu-san provided useful information and more information is expected from the cryopayload group.
Line 34: Line 37:
 * Tomura-san will likely modify the other SR coild drivers.
 * Fabian needs to finish surveying the SR2 cleanbooth in ordet to decide where the asembly frame will be.
 * Fabian will continue with the oplev cover design.
Line 40: Line 47:

----
/!\ '''Edit conflict - other version:'''

----

----
/!\ '''Edit conflict - your version:'''

----

----
/!\ '''End of edit conflict'''

----
Line 49: Line 71:


LVDT sensitivity improvement by using a 2nd readout channel. See [[https://www.dropbox.com/s/jywcdyxwrq084b3/LVDT_possible_modification.pdf?dl=0|these slides]].

Agenda/Minutes of the VIS Meeting on 2020/1/17

2020/1/17 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Photo-sensor decoupling (klog#12528)

    • Decoupling: almost done
      • The original geometrical sensing matrix was completely useless.
    • Todos: Loop gain tuning
    • Nakano-san and Yamada-kun contributed a lot to it.
  • 7.5 Hz double peak problem (klog#12473, klog#12516)

    • Only ETMY has double peaks around 7.5 Hz in TM pitch.
    • It's not critical to the PRFPMI commissioning so far, but looks annoying as reported by Nakano-san.
  • GAS control status: No saturation at present

Plan for coming weeks

Type B

Past week report

  • Okutomi-san and Yamamoto-kun modified the SRM payload sampling rate (from 4 kHz to 16 kHz) in order to make it compatible with the main interferometer control scheme.
  • Tomura-san disabled all the SRM coil drivers hardware watchdogs.
  • Fabian worked in the design of oplev cases. Akutsu-san provided useful information and more information is expected from the cryopayload group.

Plan for coming weeks

  • Tomura-san will likely modify the other SR coild drivers.
  • Fabian needs to finish surveying the SR2 cleanbooth in ordet to decide where the asembly frame will be.
  • Fabian will continue with the oplev cover design.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • Installed the OSTM suspension into the OMC chamber.


/!\ Edit conflict - other version:



/!\ Edit conflict - your version:



/!\ End of edit conflict


Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

LVDT sensitivity improvement by using a 2nd readout channel. See these slides.

Travel Plans

  • Travel (Week of 1/20):
    • Takahashi:
    • Sato: -21
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 1/27):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/1/24(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200117 (last edited 2020-01-17 15:32:09 by RyutaroTakahashi)