= Agenda/Minutes of the VIS Meeting on 2020/1/17 = 2020/1/17 14:00 - 15:00 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Aso, Fabian, Sato, Takahashi, Hirata, Ishizaki, Tanaka, Okutomi, Shoda, Akutus [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Schedule afetr O3]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] == Progress report == === Type-A === ==== Past week report ==== * Photo-sensor decoupling ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12528|klog#12528]]) * Decoupling: almost done * The original geometrical sensing matrix was completely useless. * Todos: Loop gain tuning * Nakano-san and Yamada-kun contributed a lot to it. * 7.5 Hz double peak problem ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12473|klog#12473]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12516|klog#12516]]) * Only ETMY has double peaks around 7.5 Hz in TM pitch. * It's not critical to the PRFPMI commissioning so far, but looks annoying as reported by Nakano-san. * GAS control status: No saturation at present ==== Plan for coming weeks ==== === Type B === ==== Past week report ==== * Okutomi-san and Yamamoto-kun modified the SRM payload sampling rate (from 4 kHz to 16 kHz) in order to make it compatible with the main interferometer control scheme. * Tomura-san disabled all the SRM coil drivers hardware watchdogs. * Fabian worked in the design of oplev cases. Akutsu-san provided useful information and more information is expected from the cryopayload group. ==== Plan for coming weeks ==== * Tomura-san will likely modify the other SR coild drivers. * Fabian needs to finish surveying the SR2 cleanbooth in ordet to decide where the asembly frame will be. * Fabian will continue with the oplev cover design. === Type-Bp === ==== Past week report ==== * PR3 tripped again. V1 comes back a little bit, but it does not seem to be enough. * Better values for RT watchdog? (Maybe in the future, or other suspensions.) [[https://www.dropbox.com/sh/1b8a0z4pn3d6b3g/AACopJmyfV0I2t44Ak9GIn4Ja?dl=0|RMS values]] ==== Plan for coming weeks ==== === OMMT & OSTM === ==== Past week report ==== * Installed the OSTM suspension into the OMC chamber. ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== * Sent the WD units for BS and PR2. * It is necessary to prepare for software of WD. ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == LVDT sensitivity improvement using a 2nd readout channel. See [[https://www.dropbox.com/s/jywcdyxwrq084b3/LVDT_possible_modification.pdf?dl=0|these slides]]. == Travel Plans == * Travel (Week of 1/20): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 1/27): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: == Next meeting == On 2020/1/24(Fri)