Line 19: Line 19:

 * Damping filter modification (by M. Nakano and the Three CRY Musketeers, T. Ushiba, T. Yamada, t. Nishimoto)
  * ETMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12571|klog#12571]]
  * ITMY: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12572|klog#12572]]
  * ITMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12574|klog#12574]]
 *
Line 39: Line 46:
 * Reconsideration on the replacement of PR2 and SR2 after O3.  * Reconsideration on the replacement of PR2 and SR2 after O3 ([[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Revised schedule]]).

Agenda/Minutes of the VIS Meeting on 2020/1/24

2020/1/24 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Damping filter modification (by M. Nakano and the Three CRY Musketeers, T. Ushiba, T. Yamada, t. Nishimoto)

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • Released the bellows springs in the OSTM suspension.
  • Recovered the cable for the OSEM in OMMT1.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 1/27):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 2/3):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka: