Differences between revisions 7 and 8
Revision 7 as of 2020-01-24 14:02:55
Size: 3448
Comment:
Revision 8 as of 2020-01-24 15:21:22
Size: 3005
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:

----
/!\ '''Edit conflict - other version:'''

----
Line 31: Line 26:

----
/!\ '''Edit conflict - your version:'''

----

----
/!\ '''End of edit conflict'''

----
Line 49: Line 34:
----
/!\ '''Edit conflict - other version:'''

----

----
/!\ '''Edit conflict - your version:'''

----
Line 61: Line 37:
----
/!\ '''End of edit conflict'''

----
Line 68: Line 40:
----
/!\ '''Edit conflict - other version:'''

----
Line 74: Line 42:
----
/!\ '''Edit conflict - your version:'''

----

----
/!\ '''End of edit conflict'''

----
Line 91: Line 50:
 * Sent the 4-ch WD for SR and ETMX.

Agenda/Minutes of the VIS Meeting on 2020/1/24

2020/1/24 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Payload damping filter modification (by M. Nakano and the Three CRY Musketeers, T. Ushiba, T. Yamada, T. Nishimoto)
  • Coil driver replacement (by T. Yamada, K. Okutomi)
    • The coil driver for ITMY TM actuators has been replaced to the high-power one.
    • Now all the Type-A TM actuators have high power driving.
  • GAS control status (by L. Trozzo, T. Yamamoto)
    • ITMX F2 GAS control got saturated due to temperature drift (klog#12611)

    • The limit values for the DAMP and COILOUTF filters have been increased to 30000 counts.
      • Because we don't have to take care of the analog WD tripping in the coil drivers.

Plan for coming weeks

Type B

Past week report

  • Oplev cover design is ongoing: 2 for Type Bp, 2 for SR and 2 for BS.
  • I went to the tunnel to measure the cleanroom around SR2 chamber again. I measure position of the hand rail.

Plan for coming weeks

Type-Bp

Past week report

  • Working on modeling update to include the control system.

Plan for coming weeks

OMMT & OSTM

Past week report

  • Released the bellows springs in the OSTM suspension.
  • Recovered the cable for the OSEM in OMMT1.

Plan for coming weeks

VIS electronics

  • Sent the 4-ch WD for SR and ETMX.

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 1/27):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 2/3):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/1/31(Fri)