= Agenda/Minutes of the VIS Meeting on 2020/1/24 = 2020/1/24 14:00 - 15:00 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Sato, Hirata, Shode, Fabian, Tanaka, Lucia, Okutomi, Sato, Ishizaki [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Schedule afetr O3]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] == Progress report == === Type-A === ==== Past week report ==== * Payload damping filter modification (by M. Nakano and the Three CRY Musketeers, T. Ushiba, T. Yamada, T. Nishimoto) * ETMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12571|klog#12571]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12603|#12603]] * ITMY: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12572|klog#12572]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12590|#12590]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12599|#12599]], * ITMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12574|klog#12574]] * Coil driver replacement (by T. Yamada, K. Okutomi) * The coil driver for ITMY TM actuators has been replaced to the high-power one. * Now all the Type-A TM actuators have high power driving. * GAS control status (by L. Trozzo, T. Yamamoto) * ITMX F2 GAS control got saturated due to temperature drift ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12611|klog#12611]]) * The limit values for the DAMP and COILOUTF filters have been increased to 30000 counts. * Because we don't have to take care of the analog WD tripping in the coil drivers. ==== Plan for coming weeks ==== === Type B === ==== Past week report ==== * Oplev cover design is ongoing: 2 for Type Bp, 2 for SR and 2 for BS. * I went to the tunnel to measure the cleanroom around SR2 chamber again. I measure position of the hand rail. ==== Plan for coming weeks ==== === Type-Bp === ==== Past week report ==== * Working on modeling update to include the control system. ==== Plan for coming weeks ==== === OMMT & OSTM === ==== Past week report ==== * Released the bellows springs in the OSTM suspension. * Recovered the cable for the OSEM in OMMT1. ==== Plan for coming weeks ==== === VIS electronics === * Sent the 4-ch WD for SR and ETMX. ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == * Reconsideration on the replacement of PR2 and SR2 after O3 ([[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Revised schedule]]). * Only one set of the mirror rehanging jig will be procured. * The parts for replaced mirror (wire breaker, magnet base, wire clamp) will be prepared as well. == Travel Plans == * Travel (Week of 1/27): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 2/3): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: == Next meeting == On 2020/1/31(Fri)