Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2020-01-30 10:42:44
Size: 1482
Comment:
Revision 7 as of 2020-01-31 16:54:02
Size: 1877
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/1/31 14:00 - 2020/1/31 14:00 - 15:00
Line 6: Line 6:
Participants: Participants: Takahashi, Hirata, Shoda, Sato, Ishizaki, Aso, Fabian, Okutomi, Tanaka
Line 19: Line 19:
 * Investigated LVDT coupling in BF. Though the combiner was changed in ETMX, the TF was not improved.
Line 20: Line 21:
 * Tanaka-san will measure the coupling between actuator to sensor using the setup of the prototype LVDT coils.
Line 22: Line 24:
[[https://www.dropbox.com/s/k0f9v7kru7z24zu/oplev.pdf?dl=0|oplev]]
Line 47: Line 51:
  * Fabian: Away on Friday 7th.

Agenda/Minutes of the VIS Meeting on 2020/1/31

2020/1/31 14:00 - 15:00

Zoom Meeting

Participants: Takahashi, Hirata, Shoda, Sato, Ishizaki, Aso, Fabian, Okutomi, Tanaka

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Investigated LVDT coupling in BF. Though the combiner was changed in ETMX, the TF was not improved.

Plan for coming weeks

  • Tanaka-san will measure the coupling between actuator to sensor using the setup of the prototype LVDT coils.

Type B

Past week report

oplev

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Budget status

Travel Plans

  • Travel (Week of 2/3):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Fabian: Away on Friday 7th.
  • Travel (Week of 2/10):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/2/7(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200131 (last edited 2020-01-31 16:54:02 by RyutaroTakahashi)