Size: 1482
Comment:
|
← Revision 7 as of 2020-01-31 16:54:02 ⇥
Size: 1877
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/1/31 14:00 - | 2020/1/31 14:00 - 15:00 |
Line 6: | Line 6: |
Participants: | Participants: Takahashi, Hirata, Shoda, Sato, Ishizaki, Aso, Fabian, Okutomi, Tanaka |
Line 19: | Line 19: |
* Investigated LVDT coupling in BF. Though the combiner was changed in ETMX, the TF was not improved. | |
Line 20: | Line 21: |
* Tanaka-san will measure the coupling between actuator to sensor using the setup of the prototype LVDT coils. | |
Line 22: | Line 24: |
[[https://www.dropbox.com/s/k0f9v7kru7z24zu/oplev.pdf?dl=0|oplev]] |
|
Line 47: | Line 51: |
* Fabian: Away on Friday 7th. |
Agenda/Minutes of the VIS Meeting on 2020/1/31
2020/1/31 14:00 - 15:00
Participants: Takahashi, Hirata, Shoda, Sato, Ishizaki, Aso, Fabian, Okutomi, Tanaka
Progress report
Type-A
Past week report
- Investigated LVDT coupling in BF. Though the combiner was changed in ETMX, the TF was not improved.
Plan for coming weeks
- Tanaka-san will measure the coupling between actuator to sensor using the setup of the prototype LVDT coils.
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM
Past week report
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 2/3):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Fabian: Away on Friday 7th.
- Travel (Week of 2/10):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/2/7(Fri)