Differences between revisions 4 and 5
Revision 4 as of 2020-02-07 13:59:21
Size: 2669
Editor: KokiOkutomi
Comment:
Revision 5 as of 2020-02-07 14:41:22
Size: 2859
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/2/7 14:00 - 2020/2/7 14:00 - 14:30
Line 6: Line 6:
Participants: Participants: Takahashi, Hirata, Sato, Ishizaki, Aso, Okutomi, Tanaka, Lucia
Line 47: Line 47:
 * Started investigation of LVDT-ACT coupling in the combiner circuit.
 * The combiner and the DC cable are necessary.

Agenda/Minutes of the VIS Meeting on 2020/2/7

2020/2/7 14:00 - 14:30

Zoom Meeting

Participants: Takahashi, Hirata, Sato, Ishizaki, Aso, Okutomi, Tanaka, Lucia

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

  • OPLEV box:
    • I have verbally requested information about the box for the TM oplev to the CRY group but there's no response yet.
    • I got more information from Akutsu-san about the box Mirapro designed for the MN oplev.
    • I'm making a a more suitable design using Mirapro's ideas and implementing the features requested in the previous meeting.
  • About SRM BF condition:
    • The keystone has a free range of ±130 um, presumably due to a screw that fell from upper stages which landed in the wrong place within the filer enclosure.
    • The current plan is to insert a small fibre optic camera (Ø3.9 mm) through one of the Ø5.2 mm holes at the base of the BF filter base.
  • Yokozawa-san turned off some turbo pumps in the central room, which produced the temperature to decrease.
    • The temperaure change in turn produced a drift in the DC control signals of GAS filters; in the worse case for Type B the signal reached around -18,000 counts in the BF top filter.
    • Later Yokozawa-san turned off the cooler near the BS clean booth and the temperature recovered to 23.7 degrees (23.8 degrees requested for O3).

Plan for coming weeks

  • I aim to finish the design of the SR top oplev box.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

  • Started investigation of LVDT-ACT coupling in the combiner circuit.
  • The combiner and the DC cable are necessary.

Plan for coming weeks

Other site works

Safety

Discussion

Travel Plans

  • Travel (Week of 2/10):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 2/17):
    • Takahashi:
    • Sato: 19-21(shift)
    • Hirata: 20-22(shift)
    • Shoda: 18-20(shift)
    • Fujii:
    • Tanaka:

Next meeting

On 2020/2/14(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200207 (last edited 2020-02-07 14:59:27 by RyutaroTakahashi)