= Agenda/Minutes of the VIS Meeting on 2020/2/7 = 2020/2/7 14:00 - 14:30 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Hirata, Sato, Ishizaki, Aso, Okutomi, Tanaka, Lucia [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Schedule afetr O3]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] == Progress report == === Type-A === ==== Past week report ==== * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12824|klog#12824]] ==== Plan for coming weeks ==== === Type B === ==== Past week report ==== * OPLEV box: * I have verbally requested information about the box for the TM oplev to the CRY group but there's no response yet. * I got more information from Akutsu-san about the box Mirapro designed for the MN oplev. * I'm making a a more suitable design using Mirapro's ideas and implementing the features requested in the previous meeting. * About SRM BF condition: * The keystone has a free range of ±130 um, presumably due to a screw that fell from upper stages which landed in the wrong place within the filer enclosure. * The current plan is to insert a small fibre optic camera (Ø3.9 mm) through one of the Ø5.2 mm holes at the base of the BF filter base. * Yokozawa-san turned off some turbo pumps in the central room, which produced the temperature to decrease. * The temperaure change in turn produced a drift in the DC control signals of GAS filters; in the worse case for Type B the signal reached around -18,000 counts in the BF top filter. * Later Yokozawa-san turned off the cooler near the BS clean booth and the temperature recovered to 23.7 degrees (23.8 degrees requested for O3). ==== Plan for coming weeks ==== * I aim to finish the design of the SR top oplev box. === Type-Bp === ==== Past week report ==== * IP address of the picomotor in PR3 was wrong. ==== Plan for coming weeks ==== === OMMT & OSTM === ==== Past week report ==== ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== * Started investigation of LVDT-ACT coupling in the combiner circuit. * The combiner and the DC cable are necessary. ==== Plan for coming weeks ==== === Other site works === === Safety === == Discussion == == Travel Plans == * Travel (Week of 2/10): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 2/17): * Takahashi: * Sato: 19-21(shift) * Hirata: 20-22(shift) * Shoda: 18-20(shift) * Fujii: * Tanaka: == Next meeting == On 2020/2/14(Fri)