Differences between revisions 1 and 2
Revision 1 as of 2020-02-13 09:10:57
Size: 1464
Comment:
Revision 2 as of 2020-02-14 10:20:23
Size: 1746
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:

 * TF Yaw fishing rod prototype testing
  * Test was done. Limit switch works normally. [[https://www.dropbox.com/s/gwr9mx211kwa6kj/TF%20Yaw%20Prototype.AVI?dl=0|(200Mbyte)]]
  * But the movement of the switch lever has periodic fluctuations. The cause will be investigated.

Agenda/Minutes of the VIS Meeting on 2020/2/14

2020/2/14 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • TF Yaw fishing rod prototype testing
    • Test was done. Limit switch works normally. (200Mbyte)

    • But the movement of the switch lever has periodic fluctuations. The cause will be investigated.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

  • Wire gluing in PR3.
  • C2C request in 2020FY.

Travel Plans

  • Travel (Week of 2/17):
    • Takahashi:
    • Sato: 19-21(shift)
    • Hirata: 20-22(shift)
    • Shoda: 18-20(shift)
    • Fujii:
    • Tanaka:
  • Travel (Week of 2/24):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/2/21(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200214 (last edited 2020-02-14 16:26:18 by RyutaroTakahashi)