2020/2/14 14:00 -  2020/2/14 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 19: Line 19:
Line 27: Line 26:
Oplev box: I got information from Hagiwara-san and Ushiba-san

 * They will use welded aluminium 3 mm thick slabs.
 * Access is mainly from the top.
Line 42: Line 46:

Agenda/Minutes of the VIS Meeting on 2020/2/14

2020/2/14 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • TF Yaw fishing rod prototype testing
    • Test was done. Limit switch works normally. (200Mbyte)

    • But the movement of the switch lever has periodic fluctuations. The cause will be investigated.

Plan for coming weeks

Type B

Past week report

Oplev box: I got information from Hagiwara-san and Ushiba-san

  • They will use welded aluminium 3 mm thick slabs.
  • Access is mainly from the top.

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

  • Wire gluing in PR3.
  • C2C request in 2020FY.

Travel Plans

  • Travel (Week of 2/17):
    • Takahashi:
    • Sato: 19-21(shift)
    • Hirata: 20-22(shift)
    • Shoda: 18-20(shift)
    • Fujii:
    • Tanaka:
  • Travel (Week of 2/24):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka: