= Agenda/Minutes of the VIS Meeting on 2020/2/14 = 2020/2/14 14:00 - 15:45 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Sato, Hirata, Aso, Fabian, Tanaka, Shoda, Okutomi, Lucia [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/e0inlp006spuj4m/Schedule%20after%20O3.pdf?dl=0|Schedule afetr O3]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] == Progress report == === Type-A === ==== Past week report ==== * Top Filter Yaw fishing rod prototype testing * Test was done. Limit switch works normally. [[https://www.dropbox.com/s/gwr9mx211kwa6kj/TF%20Yaw%20Prototype.AVI?dl=0|(200Mbyte)]] * But the movement of the switch lever has periodic fluctuations. The cause will be investigated. * Transfer function measurements (L.Trozzo, T. Yamada, T. Yokozawa) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12842|klog#12842]] * Control noise projection (T. Yamada) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12861|klog#12861]] * Damping loop modifications (M. Nakano, T. Ushiba) * ETMY F0 GAS [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12860|klog#12860]] * ITMX MN OpLev [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12862|klog#12862]] * ITMY MN OpLev [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12862|klog#12862]] * ETMY TM yaw [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12937|klog#12937]] ==== Plan for coming weeks ==== * ETMY TM coil driver will be replaced to a normal high-power coil driver this evening. (K. Okutomi) === Type B === ==== Past week report ==== * Oplev box: I got information from Hagiwara-san and Ushiba-san. * I will show the design I have. ==== Plan for coming weeks ==== === Type-Bp === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM === ==== Past week report ==== ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== * Measured the TF of the combiner itself and the TF from the actuator coil to the output of demodulator (AD630) with the low-pass filter. * Found an excess around 20Hz in the demodulator output. ==== Plan for coming weeks ==== === Other site works === === Safety === == Discussion == * Wire gluing in PR3. * C2C request in 2020FY. == Travel Plans == * Travel (Week of 2/17): * Takahashi: * Sato: 19-21(shift) * Hirata: 20-22(shift) * Shoda: 18-20(shift) * Fujii: * Tanaka: * Travel (Week of 2/24): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: == Next meeting == On 2020/2/21(Fri)