Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
Participants: | Participants: Takahashi, Shoda, Tanaka, Akutsu, Fabian, Hirata, Aso |
Line 17: | Line 17: |
* Enabled the one whitening filters for Oplevs for all Type-As. |
|
Line 20: | Line 22: |
* The fiber scope was delivered. It had actually a head of 3.9mm in diameter. The fiber is a shape memory type. | |
Line 23: | Line 26: |
* Enabled the two whitening filters for Oplevs for PR3 and PRM, and three for PR2. * Some roll offs have been set. |
|
Line 29: | Line 35: |
* Measured the TFs from the output of ACT to the before/after demodulator. * The TFs should be compared with the theoretical calculation. |
|
Line 34: | Line 43: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0092/E1809209/008/O4%20schedule%20200217.pdf|Uchiyama-san's schedule plan]] (linked by Shoda) |
Agenda/Minutes of the VIS Meeting on 2020/2/21
2020/2/21 14:00 -
Participants: Takahashi, Shoda, Tanaka, Akutsu, Fabian, Hirata, Aso
Progress report
Type-A
Past week report
- Enabled the one whitening filters for Oplevs for all Type-As.
Plan for coming weeks
Type B
Past week report
- The fiber scope was delivered. It had actually a head of 3.9mm in diameter. The fiber is a shape memory type.
Plan for coming weeks
Type-Bp
Past week report
- Enabled the two whitening filters for Oplevs for PR3 and PRM, and three for PR2.
- Some roll offs have been set.
Plan for coming weeks
OMMT & OSTM
Past week report
Plan for coming weeks
VIS electronics
Past week report
- Measured the TFs from the output of ACT to the before/after demodulator.
- The TFs should be compared with the theoretical calculation.
Plan for coming weeks
Other site works
Safety
Discussion
Uchiyama-san's schedule plan (linked by Shoda)
Travel Plans
- Travel (Week of 2/24):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 3/2):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/2/28(Fri)