Differences between revisions 8 and 9
Revision 8 as of 2020-02-21 16:42:22
Size: 2029
Comment:
Revision 9 as of 2020-02-21 16:42:56
Size: 2031
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
==== Past week report ====
Line 27: Line 28:
==== Past week report ====

Agenda/Minutes of the VIS Meeting on 2020/2/21

2020/2/21 14:00 -

Zoom Meeting

Participants: Takahashi, Shoda, Tanaka, Akutsu, Fabian, Hirata, Aso

VIS Commissioning Task List

Post-O3 task list

Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Enabled the one whitening filters for Oplevs for all Type-As.

Plan for coming weeks

Type B

Past week report

  • The fiber scope was delivered. It had actually a head of 3.9mm in diameter. The fiber is a shape memory type.

Plan for coming weeks

Type-Bp

Past week report

  • Enabled the two whitening filters for Oplevs for PR3 and PRM, and three for PR2.
  • Some roll offs have been set.

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

  • Measured the TFs from the output of ACT to the before/after demodulator.
  • The TFs should be compared with the theoretical calculation.

Plan for coming weeks

Other site works

Safety

Discussion

Travel Plans

  • Travel (Week of 2/24):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 3/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/2/28(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200221 (last edited 2020-02-21 16:43:44 by RyutaroTakahashi)