Differences between revisions 2 and 3
Revision 2 as of 2020-02-28 10:24:41
Size: 1388
Editor: naohisa.sato
Comment:
Revision 3 as of 2020-02-28 13:49:24
Size: 1613
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
 * PRM Oplev signals are wired (P&Y has coherence at 1-10 Hz) while the noise level does not change after turning the whitening filters on.
 * PRM guardian need to be modified not to see coil BIO which is already disabled.

Agenda/Minutes of the VIS Meeting on 2020/2/28

2020/2/28 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Procurement list in 2019FY

Schedule afetr O3

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

  • PRM Oplev signals are wired (P&Y has coherence at 1-10 Hz) while the noise level does not change after turning the whitening filters on.

  • PRM guardian need to be modified not to see coil BIO which is already disabled.

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

Discussion

Travel Plans

  • Travel (Week of 3/2):
    • Takahashi:
    • Sato: 4 (KEK)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 3/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2020/3/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200228 (last edited 2020-02-28 17:34:12 by RyutaroTakahashi)