Size: 1358
Comment:
|
Size: 1945
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/3/13 14:00 - | 2020/3/13 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 22: | Line 22: |
* I wrote a document with guidelines for the design the oplev boxes: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11540|JGW-E2011540-v1]]. * It's intended for Mirapro. * Some information still needs to be included. * Please give me feedback in case you feel like. * A 3D-CAD is included. * I measured transfer functions from some BS DoF to DARM: klog entries [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13463|13463]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13477|13477]]. * Projections of noise onto DARM not done yet. |
|
Line 34: | Line 42: |
Line 39: | Line 45: |
* Sato: | * Sato: 17-18 (Kashiwa) |
Line 47: | Line 53: |
* Sato: | * Sato: 23-25 |
Agenda/Minutes of the VIS Meeting on 2020/3/13
2020/3/13 14:00 -
Participants:
Progress report
Type-A
Past week report
Plan for coming weeks
Type B
Past week report
I wrote a document with guidelines for the design the oplev boxes: JGW-E2011540-v1.
- It's intended for Mirapro.
- Some information still needs to be included.
- Please give me feedback in case you feel like.
- A 3D-CAD is included.
I measured transfer functions from some BS DoF to DARM: klog entries 13463 and 13477.
- Projections of noise onto DARM not done yet.
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Safety
Discussion
Travel Plans
- Travel (Week of 3/16):
- Takahashi: 16-18
- Sato: 17-18 (Kashiwa)
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 3/23):
- Takahashi:
- Sato: 23-25
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/3/27(Fri)