Size: 1211
Comment:
|
Size: 1684
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/4/3 14:00 - | 2020/4/3 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 17: | Line 17: |
* Analysis of the tie-rods for corrugated tube. * Revising the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A installation procedure]]. |
|
Line 20: | Line 23: |
BS frame . |
|
Line 32: | Line 37: |
* Plan for the long OR brake * Update without opening the chambers. * Signal generator cards for the LVDT driver. * Release sensor monitor. * Additional filters for the LVDT combiner. * New Oplev covers, * Temperature control. * New control scheme. |
Agenda/Minutes of the VIS Meeting on 2020/4/3
2020/4/3 14:00 -
Participants:
Progress report
Type-A
Past week report
- Analysis of the tie-rods for corrugated tube.
Revising the Type-A installation procedure.
Plan for coming weeks
Type B
Past week report
BS frame .
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Safety
Discussion
- Plan for the long OR brake
- Update without opening the chambers.
- Signal generator cards for the LVDT driver.
- Release sensor monitor.
- Additional filters for the LVDT combiner.
- New Oplev covers,
- Temperature control.
- New control scheme.
- Update without opening the chambers.
Travel Plans
- Travel (Week of 4/6):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Tanaka:
- Travel (Week of 4/13):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Tanaka:
Next meeting
On 2020/4/10(Fri)