Size: 1712
Comment:
|
Size: 2204
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* ITMY IP coil-magnet actuation got saturated (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13922|13922]]). Fabian (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13923|13923]]) and Lucia ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13932|12932]]) moved the IP with horizontal fishing rods ---- /!\ '''Edit conflict - other version:''' ---- * Designing the LVDT coils for the ACCs. ---- /!\ '''Edit conflict - your version:''' ---- ---- /!\ '''End of edit conflict''' ---- |
Agenda/Minutes of the VIS Meeting on 2020/4/3
2020/4/3 14:00 -
Participants:
Progress report
Type-A
Past week report
- Analysis of the tie-rods for corrugated tube.
Revising the Type-A installation procedure.
ITMY IP coil-magnet actuation got saturated (klog 13922). Fabian (klog 13923) and Lucia (12932) moved the IP with horizontal fishing rods
Edit conflict - other version:
- Designing the LVDT coils for the ACCs.
Edit conflict - your version:
End of edit conflict
Plan for coming weeks
Type B
Past week report
BS frame . BS_frame.png
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Safety
Discussion
- Plan for the long OR brake
- Update without opening the chambers.
- Signal generator cards for the LVDT driver.
- Release sensor monitor.
- Additional filters for the LVDT combiner.
- New Oplev covers,
- Temperature control.
- New control scheme.
- Update without opening the chambers.
Travel Plans
- Travel (Week of 4/6):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Tanaka:
- Travel (Week of 4/13):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Tanaka:
Next meeting
On 2020/4/10(Fri)