Differences between revisions 4 and 14 (spanning 10 versions)
Revision 4 as of 2020-04-03 09:14:19
Size: 1645
Comment:
Revision 14 as of 2020-04-03 11:52:35
Size: 2041
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/4/3 14:00 -  2020/4/3 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 17: Line 17:
 * Analysis of the tie-rods for corrugated tube.
 * Revising the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A installation procedure]].
 * ITMY IP coil-magnet actuation got saturated (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13922|13922]]). Fabian (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13923|13923]]) and Lucia ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13932|12932]]) moved the IP with horizontal fishing rods
 * Designing the LVDT coils for the ACCs.
Line 20: Line 25:
BS frame . [[attachment:BS_frame.png]]
Line 32: Line 39:
Plan for the long OR brake

Six month shift of the observation run is proposed by VIRGO. Though the situation is uncertain, we should start to consider the plan for the long OR brake.
  *Update without opening the chambers.
 * Plan for the long OR brake
  * Update without opening the chambers.
Line 37: Line 42:
   * Release sensor monitor.     * Release sensor monitor.
Line 39: Line 44:
   * New OpLev covers,    * New Oplev covers,

Agenda/Minutes of the VIS Meeting on 2020/4/3

2020/4/3 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Progress report

Type-A

Past week report

  • Analysis of the tie-rods for corrugated tube.
  • Revising the Type-A installation procedure.

  • ITMY IP coil-magnet actuation got saturated (klog 13922). Fabian (klog 13923) and Lucia (12932) moved the IP with horizontal fishing rods

  • Designing the LVDT coils for the ACCs.

Plan for coming weeks

Type B

Past week report

BS frame . BS_frame.png

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

Type-C

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Safety

Discussion

  • Plan for the long OR brake
    • Update without opening the chambers.
      • Signal generator cards for the LVDT driver.
      • Release sensor monitor.
      • Additional filters for the LVDT combiner.
      • New Oplev covers,
    • Temperature control.
    • New control scheme.

Travel Plans

  • Travel (Week of 4/6):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Tanaka:
  • Travel (Week of 4/13):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Tanaka:

Next meeting

On 2020/4/10(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200403 (last edited 2020-04-03 15:46:44 by RyutaroTakahashi)