Size: 1314
Comment:
|
Size: 1947
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/4/17 14:00 - | 2020/4/17 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 10: | Line 10: |
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] | [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Task list towards O4]] |
Line 14: | Line 14: |
[[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan for the long OR brake]] | == Progress report == === General === Miyo-kun is gathered information about LVDTs at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]]. Feedback seems to be required. |
Line 16: | Line 18: |
== Progress report == | |
Line 18: | Line 19: |
==== Past week report ==== | |
Line 20: | Line 20: |
==== Plan for coming weeks ==== | |
Line 22: | Line 22: |
==== Past week report ==== ==== Plan for coming weeks ==== |
* In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11612|JGW-T2011612]], which I will be updating.Currently the content is * Linear ranges of 24 OSEMs and * Sensitivity of the six SRM OSEMS. * I gave feedback to Miyo-kun about LVDTs. |
Line 25: | Line 28: |
==== Past week report ==== ==== Plan for coming weeks ==== |
|
Line 28: | Line 29: |
==== Past week report ==== ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== |
=== Electronics === == Post O3 (4/21~) == * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]] * Papers (Type-B: Fabian, Type-A:?) * Operation mode at the shutdown of KAGRA == Towards O3c == * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]] == Controls == * Had a VIS control strategy meeting [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11557|documents]] |
Line 35: | Line 43: |
* Papaers | |
Line 37: | Line 44: |
Agenda/Minutes of the VIS Meeting on 2020/4/17
2020/4/17 14:00 -
Participants:
Progress report
General
Miyo-kun is gathered information about LVDTs at JGW-T2011597. Feedback seems to be required.
Type-A
Revising the Type-A installation procedure.
Type B
In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : JGW-T2011612, which I will be updating.Currently the content is
- Linear ranges of 24 OSEMs and
- Sensitivity of the six SRM OSEMS.
- I gave feedback to Miyo-kun about LVDTs.
Type-Bp
Type-C
Electronics
Post O3 (4/21~)
- Papers (Type-B: Fabian, Type-A:?)
- Operation mode at the shutdown of KAGRA
Towards O3c
Controls
Had a VIS control strategy meeting documents
Safety
Discussion
Travel Plans
Next meeting
On 2020/4/24(Fri)