Line 2: Line 2:
2020/4/17 14:00 -  2020/4/17 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 10: Line 10:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Task list towards O4]]
Line 14: Line 14:
[[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan for the long OR brake]] == Progress report ==
=== General ===
Miyo-kun is gathered information about LVDTs at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]]. Feedback seems to be required.
Line 16: Line 18:
== Progress report ==
Line 18: Line 19:
==== Past week report ====
Line 20: Line 20:
==== Plan for coming weeks ====
Line 22: Line 22:
==== Past week report ====
==== Plan for coming weeks ====
 * For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in the [[https://1drv.ms/b/s!AoQaV1tdsEcUgc5MtkkqJv5fcCYBrw?e=TXSzu0|presentation]] shown the Commissioning Meeting on the 27th of September 2019.
 * In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11612|JGW-T2011612]], which I will be updating.Currently the content is
  * Linear ranges of 24 OSEMs and
  * Sensitivity of the six SRM OSEMS.
 * I gave feedback to Miyo-kun about LVDTs.
Line 25: Line 29:
==== Past week report ====
==== Plan for coming weeks ====
Line 28: Line 30:
==== Past week report ====
==== Plan for coming weeks ====
=== VIS electronics ===
==== Past week report ====
==== Plan for coming weeks ====
=== Electronics ===
== Post O3 (4/21~) ==
 * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]
 * Papers (Type-B: Fabian, Type-A:?)
 * Operation mode at the shutdown of KAGRA

== Towards O3c ==
 * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]]

== Controls ==
 * Had a VIS control strategy meeting [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11557|documents]]
Line 35: Line 44:
 * Papaers
Line 37: Line 45:

Agenda/Minutes of the VIS Meeting on 2020/4/17

2020/4/17 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Task list towards O4

Schedule afetr O3

Progress report

General

Miyo-kun is gathered information about LVDTs at JGW-T2011597. Feedback seems to be required.

Type-A

Type B

  • For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in the presentation shown the Commissioning Meeting on the 27th of September 2019.

  • In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : JGW-T2011612, which I will be updating.Currently the content is

    • Linear ranges of 24 OSEMs and
    • Sensitivity of the six SRM OSEMS.
  • I gave feedback to Miyo-kun about LVDTs.

Type-Bp

Type-C

Electronics

Post O3 (4/21~)

  • Request

  • Papers (Type-B: Fabian, Type-A:?)
  • Operation mode at the shutdown of KAGRA

Towards O3c

Controls

  • Had a VIS control strategy meeting documents

Safety

Discussion

Travel Plans

Next meeting

On 2020/4/24(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200417 (last edited 2020-04-18 10:45:23 by RyutaroTakahashi)