Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2020-04-16 09:09:23
Size: 1314
Comment:
Revision 5 as of 2020-04-17 08:20:39
Size: 1073
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
[[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan for the long OR brake]]
Line 18: Line 16:
==== Past week report ====
Line 20: Line 17:
==== Plan for coming weeks ====
Line 22: Line 18:
==== Past week report ====
==== Plan for coming weeks ====
Line 25: Line 19:
==== Past week report ====
==== Plan for coming weeks ====
Line 28: Line 20:
==== Past week report ====
==== Plan for coming weeks ====
=== VIS electronics ===
==== Past week report ====
==== Plan for coming weeks ====
=== Electronics ===
== Post O3 ==
 * Request
 * Papers
== Towards O3c ==
 * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]]
Line 35: Line 28:
 * Papaers  * Operation mode at the shutdown of KAGRA

Agenda/Minutes of the VIS Meeting on 2020/4/17

2020/4/17 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Progress report

Type-A

Type B

Type-Bp

Type-C

Electronics

Post O3

  • Request
  • Papers

Towards O3c

Safety

Discussion

  • Operation mode at the shutdown of KAGRA

Travel Plans

Next meeting

On 2020/4/24(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200417 (last edited 2020-04-18 10:45:23 by RyutaroTakahashi)