Line 17: Line 17:
 * Calibration factors of LVDTs at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]].
 * For O4, I'm also preparing the cabling diagram at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11573|JGW-D2011573]]for all VIS suspension, which includes connections between AEL circuits and pin assignment at the feed-through. '''I need information about the pin assignment for all suspensions''' to make the diagram. -> Sato-san?(about Type-A) and Shoda-san? (about Type-Bp)
 * Calibration factors of LVDTs at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]]. Please give me comments especially Type-A and Type-Bp. Type-B is OK. Thank you fabian!
 * Cabling diagram at [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11573|JGW-D2011573]], which includes connections between AEL circuits and pin assignment at the feed-through. '''I need information about the pin assignment for all suspensions''' to make the diagram. -> Sato-san?(about Type-A) and Shoda-san? (about Type-Bp)

Agenda/Minutes of the VIS Meeting on 2020/4/17

2020/4/17 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Task list towards O4

Schedule afetr O3

Progress report

General

(Miyo) I'm gathering information about the hardware.

  • Calibration factors of LVDTs at JGW-T2011597. Please give me comments especially Type-A and Type-Bp. Type-B is OK. Thank you fabian!

  • Cabling diagram at JGW-D2011573, which includes connections between AEL circuits and pin assignment at the feed-through. I need information about the pin assignment for all suspensions to make the diagram. -> Sato-san?(about Type-A) and Shoda-san? (about Type-Bp)

Type-A

Type B

  • For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in this presentation shown the Commissioning Meeting on the 27th of September 2019.

  • In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : JGW-T2011612, which I will be updating.Currently the content is

    • Linear ranges of 24 OSEMs and
    • Sensitivity of the six SRM OSEMS.
  • I gave feedback to Miyo-kun about LVDTs: all the current calibration factors in medm screens are consistent with klog reports. Just as a reminder:
    • The polarity of LVDTs is set in hardware: increase in LVDT output always means upwards motion or positive yaw in the IPs. Therefore, calibration factors in medm screens should always be positive.
    • An exception seems to be BS IP H2 LVDT, whose medm screen I have to check for a minus sign somewhere.
    • The offsets in medm screens correspond to the nominal places of keystones per the 3D-CAD, not the mid-point of the linear range.

Type-Bp

Type-C

Electronics

Post O3 (4/21~)

  • Request

  • Papers (Type-B: Fabian, Type-A: Lucia?)
  • Operation mode at the shutdown of KAGRA

Towards O3c

Controls

  • Had a VIS control strategy meeting documents

Safety

Discussion

Travel Plans

Next meeting

On 2020/4/24(Fri)