Differences between revisions 27 and 28
Revision 27 as of 2020-04-17 12:19:05
Size: 3215
Editor: KousekiMiyo
Comment:
Revision 28 as of 2020-04-17 12:22:17
Size: 3213
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]] Calibration factors of LVDTs . 
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11597|JGW-T2011597]] Calibration factors of LVDTs .
Line 19: Line 20:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11573|JGW-D2011573]] Cabling diagram which includes connections between AEL circuits and pin assignment at the feed-through.   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11573|JGW-D2011573]] Cabling diagram which includes connections between AEL circuits and pin assignment at the feed-through.
Line 21: Line 22:
Line 27: Line 27:
 * For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in this [[https://1drv.ms/b/s!AoQaV1tdsEcUgc5MtkkqJv5fcCYBrw?e=TXSzu0|presentation]] shown the Commissioning Meeting on the 27th of September 2019.
Line 48: Line 47:
 * For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in this [[https://1drv.ms/b/s!AoQaV1tdsEcUgc5MtkkqJv5fcCYBrw?e=TXSzu0|presentation]] shown the Commissioning Meeting on the 27th of September 2019.

Agenda/Minutes of the VIS Meeting on 2020/4/17

2020/4/17 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Task list towards O4

Schedule afetr O3

Progress report

General

(Miyo) I'm gathering information about the hardware part. (e.g. cabling, calibration of sensors and actuators.)

  • JGW-T2011597 Calibration factors of LVDTs .

    • Please check about Type-A and Type-Bp. (Type-B is OK. Thank you fabian! :) )

  • JGW-D2011573 Cabling diagram which includes connections between AEL circuits and pin assignment at the feed-through.

    • Need information about the pin assignment for all suspensions -> Sato-san? and Shoda-san?

Type-A

Type B

  • In the context of writing a paper I gathered information about OSEMs and LVDTs and uploaded a document at : JGW-T2011612, which I will be updating.Currently the content is

    • Linear ranges of 24 OSEMs and
    • Sensitivity of the six SRM OSEMS.
  • I gave feedback to Miyo-kun about LVDTs: all the current calibration factors in medm screens are consistent with klog reports. Just as a reminder:
    • The polarity of LVDTs is set in hardware: increase in LVDT output always means upwards motion or positive yaw in the IPs. Therefore, calibration factors in medm screens should always be positive.
    • An exception seems to be BS IP H2 LVDT, whose medm screen I have to check for a minus sign somewhere.
    • The offsets in medm screens correspond to the nominal places of keystones per the 3D-CAD, not the mid-point of the linear range.

Type-Bp

Type-C

Electronics

Post O3 (4/21~)

  • Request

  • Papers (Type-B: Fabian, Type-A: Lucia?)
  • Operation mode at the shutdown of KAGRA

Towards O3c

Controls

  • For a summary of the current status of inertial damping in Type-B suspensions see the appendix (p14 onwards) in this presentation shown the Commissioning Meeting on the 27th of September 2019.

  • Had a VIS control strategy meeting documents

Safety

Discussion

Travel Plans

Next meeting

On 2020/4/24(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200417 (last edited 2020-04-18 10:45:23 by RyutaroTakahashi)