Size: 1070
Comment:
|
Size: 1216
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] | [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Task list towards O4]] |
Line 21: | Line 21: |
== Post O3 == * Request * Papers == Towards O3c |
== Post O3 (4/21~) == * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]] * Papers (Type-B: Fabian, Type-A:?) * Operation mode at the shutdown of KAGRA == Towards O3c == |
Line 28: | Line 29: |
* Operation mode at the shutdown of KAGRA |
Agenda/Minutes of the VIS Meeting on 2020/4/17
2020/4/17 14:00 -
Participants:
Progress report
Type-A
Revising the Type-A installation procedure.
Type B
Type-Bp
Type-C
Electronics
Post O3 (4/21~)
- Papers (Type-B: Fabian, Type-A:?)
- Operation mode at the shutdown of KAGRA
Towards O3c
Safety
Discussion
Travel Plans
Next meeting
On 2020/4/24(Fri)