Size: 1113
Comment:
|
Size: 1579
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
Participants: [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] |
Participants: |
Line 17: | Line 15: |
* Making the integrated 3D models for each Type-A tower. | |
Line 18: | Line 17: |
No apparent damage was inflicted to Type-B suspensions by the earthquakes. * All the signals from the QPDs and from the OSEMs look fine. * They can be put in ALINED state without apparent problem. * Yokozawa-san was able to lock the Y Arm with green light, which confirms that at least SR3 is fine. |
|
Line 20: | Line 25: |
* AOS(Akutsu-san) suggested to modify the IMMT2 suspension. |
|
Line 25: | Line 32: |
* Type-B: Fabian * Type-A: Lucia, Fujii(Sensor collection). |
* Type-A: Lucia(General), Fujii(Sensor collection). * Type-B: Fabian: I have been gathering data about sensors and writing; there's still no draft to share. |
Line 28: | Line 36: |
* [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]] | * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]] |
Agenda/Minutes of the VIS Meeting on 2020/4/24
2020/4/24 14:00 -
Participants:
Progress report
General
Type-A
- Making the integrated 3D models for each Type-A tower.
Type B
No apparent damage was inflicted to Type-B suspensions by the earthquakes.
- All the signals from the QPDs and from the OSEMs look fine.
- They can be put in ALINED state without apparent problem.
- Yokozawa-san was able to lock the Y Arm with green light, which confirms that at least SR3 is fine.
Type-Bp
Type-C
- AOS(Akutsu-san) suggested to modify the IMMT2 suspension.
Controls
Electronics
Post O3 (4/21~)
- Papers
- Type-A: Lucia(General), Fujii(Sensor collection).
- Type-B: Fabian: I have been gathering data about sensors and writing; there's still no draft to share.
Towards O3c
Safety
Discussion
Travel Plans
Next meeting
On 2020/5/1(Fri)