Size: 1719
Comment:
|
Size: 1819
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
Nakano-kun recovered PR3: klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14300|14300]]. | * Nakano-kun recovered PR3: klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14300|14300]]. * It seems PR2 required IM pocomotor adjustment but apprently there's no klog report about it. |
Agenda/Minutes of the VIS Meeting on 2020/4/24
2020/4/24 14:00 -
Participants:
Progress report
General
Type-A
- Making the integrated 3D models for each Type-A tower.
Type B
No apparent damage was inflicted to Type-B suspensions by the earthquakes.
- All the signals from the QPDs and from the OSEMs look fine.
- They can be put in ALINED state without apparent problem.
- Yokozawa-san was able to lock the Y Arm with green light, which confirms that at least SR3 is fine.
- Later Nakano-kun recovered the PRFPMI.
Type-Bp
Nakano-kun recovered PR3: klog entry 14300.
- It seems PR2 required IM pocomotor adjustment but apprently there's no klog report about it.
Type-C
- AOS(Akutsu-san) suggested to modify the IMMT2 suspension.
Controls
Electronics
Post O3 (4/21~)
- Papers
- Type-A: Lucia(General), Fujii(Sensor collection).
- Type-B: Fabian: I have been gathering data about sensors and writing; there's still no draft to share.
Towards O3c
Safety
Discussion
Travel Plans
Next meeting
On 2020/5/1(Fri)