Line 18: Line 18:
 * AOS(Akutsu-san) suggested to modify the IMMT2 suspension.  * Modification of the IMMT2 suspension.
  * The ghost beams are interfering with the pillar of suspension. The footprint should be changed.
Line 24: Line 25:
 * Tasks for the papers will be available after May 7th (actually May 11th) at earliest.
 *
[[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]
 * Tasks for the papers will be available after May 7th (actually May 11th) at earliest ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]).

Agenda/Minutes of the VIS Meeting on 2020/5/1

2020/5/1 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type B

Type-Bp

Type-C

  • Modification of the IMMT2 suspension.
    • The ghost beams are interfering with the pillar of suspension. The footprint should be changed.

Controls

Electronics

Post O3

  • KAGRA went to the suspended mode from 28th April.
  • Tasks for the papers will be available after May 7th (actually May 11th) at earliest (Request).

  • Papers
    • Type-A: Lucia(General), Fujii(Sensor collection).
    • Type-B: Fabian