Line 15: Line 15:
  * Integrated 3D model of each Type-A tower.(JGW-D2011655)
   * According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) [[attachment:ETM BF Dumper.pdf]]

Agenda/Minutes of the VIS Meeting on 2020/5/15

2020/5/15 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

  • Integrated 3D model of each Type-A tower.(JGW-D2011655)
    • According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) ETM BF Dumper.pdf

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is in the suspended mode until 31st May.
  • Only measurements, which can be done remotely, are available (Request).

  • O3c is still under discussion between LVK (Plan, Sheet).

  • Papers
    • Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
    • Type-B: Fabian

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/5/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200515 (last edited 2020-05-15 14:48:52 by RyutaroTakahashi)