Size: 1582
Comment:
|
← Revision 14 as of 2020-05-29 15:43:10 ⇥
Size: 3846
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/5/29 14:00 - | 2020/5/29 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: Takahashi, Fabian, Sato, Hirata, Shoda, Miyo, Tanaka, Aso, Lucia, Washimi |
Line 15: | Line 15: |
* As reported by Yamamoto-san ( see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14432) F1 GAS output was satured. So Yesterday I offloaded the GAS output by changing the offset on F1 and F2 (see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14434) * I took advantage of the suspended mode of KAGRA to investigate some strange response of the geophone installed on the Type A suspension. The test has been done with EX geophone. Basically, I changed the cutoff of the calibration filter from 10 mHz to 3 mHz and I measured the TF= GEO/(LVDT*w). By moving back to 3 mHz the DC cutoff the phase shift is reduced a lot, but the DC noise is growing up. I turned on the ID with blending at 140 mHz: the loop is stable, but the 148 mHz peack got excited (see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14443). |
|
Line 16: | Line 21: |
* I worked in the measurements of the decay times of SR2. I still have to analyze data. No results to show yet. * Washimi-san reported the feedback signal in SRM F0 was too high. I offloaded onto the fishing rod this morning (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14436|14436]]). According to the [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/OpsManual/FishingRods|VIS wilki fishing rod page]], this fishing rod does not suffer of any known problems. * I will postpone asking questions about inertial damping again for next week. |
|
Line 18: | Line 27: |
* 3D CAD model of the present IMMT2 suspension is completed. |
|
Line 19: | Line 30: |
* Working on the Type-A situation reproduction, which was assigned at cryo-payload upgrade review. (Shoda) * Comparing the IP performance from the design. |
|
Line 20: | Line 34: |
* Test parts have been delivered. * The experiment will start from the week after next week. * Test of the LVDT card modification on the grounding is planed. |
|
Line 22: | Line 40: |
* More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba). | * More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba). |
Line 26: | Line 44: |
* Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]). | Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]). |
Line 30: | Line 49: |
* Papers * Mechanics of Type-A tower + Cryo-payload: Shoda (on going) * Performance of Type-A: Lucia * Control of Type-A: Lucia? * Control (Sensor correction): Fujii * Type-B: Fabian (on going) * Personnel towards O4 * Takahashi supervises both teams. * Type-A team: Sato, Miyo, Takahashi, company person * Type-B/Bp team: Shoda(supervisor), Hirata, Fabian, Terrence, Washimi, company person |
Agenda/Minutes of the VIS Meeting on 2020/5/29
2020/5/29 14:00 -
Participants: Takahashi, Fabian, Sato, Hirata, Shoda, Miyo, Tanaka, Aso, Lucia, Washimi
Progress report
General
Type-A
As reported by Yamamoto-san ( see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14432) F1 GAS output was satured. So Yesterday I offloaded the GAS output by changing the offset on F1 and F2 (see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14434)
I took advantage of the suspended mode of KAGRA to investigate some strange response of the geophone installed on the Type A suspension. The test has been done with EX geophone. Basically, I changed the cutoff of the calibration filter from 10 mHz to 3 mHz and I measured the TF= GEO/(LVDT*w). By moving back to 3 mHz the DC cutoff the phase shift is reduced a lot, but the DC noise is growing up. I turned on the ID with blending at 140 mHz: the loop is stable, but the 148 mHz peack got excited (see klog http://klog.icrr.u-tokyo.ac.jp/osl/?r=14443).
Type-B
- I worked in the measurements of the decay times of SR2. I still have to analyze data. No results to show yet.
Washimi-san reported the feedback signal in SRM F0 was too high. I offloaded onto the fishing rod this morning (klog entry 14436). According to the VIS wilki fishing rod page, this fishing rod does not suffer of any known problems.
- I will postpone asking questions about inertial damping again for next week.
Type-Bp
Type-C
- 3D CAD model of the present IMMT2 suspension is completed.
Controls
- Working on the Type-A situation reproduction, which was assigned at cryo-payload upgrade review. (Shoda)
- Comparing the IP performance from the design.
Electronics
- Test parts have been delivered.
- The experiment will start from the week after next week.
- Test of the LVDT card modification on the grounding is planed.
Post O3
- KAGRA is still in the suspended mode. Only remote measurements are available until May 31st (Q-measurement by Fabian, Type-A measurement by Lucia).
- More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba).
- Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, task for O3c will be available as well (e.g. Sensor correction for SRs).
- Post Obs. task has priority higher than task for O3c. Two weeks, at least, in June will be assigned for Post Obs. task.
- The site work towards O4 will be rescheduled.
Post Obs. task (Request), Task for O3c (Plan, Sheet).
Safety
Discussion
- Papers
- Mechanics of Type-A tower + Cryo-payload: Shoda (on going)
- Performance of Type-A: Lucia
- Control of Type-A: Lucia?
- Control (Sensor correction): Fujii
- Type-B: Fabian (on going)
- Personnel towards O4
- Takahashi supervises both teams.
- Type-A team: Sato, Miyo, Takahashi, company person
- Type-B/Bp team: Shoda(supervisor), Hirata, Fabian, Terrence, Washimi, company person
Travel Plans
Next meeting
- On 2020/6/5(Fri)