 * Started measurements of the circuits. It takes much time due to many variations of inductor.
Line 36: Line 38:

 * Tasks on electronics should be combined to the task list towards O4.
 * Procedure of the wire gluing should be confirmed beforehand.
 * Schedule including the commissioning should be considered, but overall plan and schedule, which will be discussed in the next SEO/Chief meeting, are necessary to make detail schedule.

Agenda/Minutes of the VIS Meeting on 2020/6/5

2020/6/5 14:00 -

Zoom Meeting

Participants: Takahashi, Fabian, Sato, Hirata, Aso, Shoda, Lucia, Ishizaki, Tanaka, Miyo

Task list towards O4

Schedule towards O4

Progress report

General

  • Because of Nakano-san and Miyoki-san's request, Miyo made VIS_MANAGER guardian to monitor and manage all suspensions. klog14469

  • Now, this guardian requests the all suspensions to go PAY_LOCAL_DAMPED state for safety when an earthquake hits.
  • but, there are no big earthquakes from this work. When big earthquakes happen, I will check and modify this guardian.

Type-A

Type-B

  • Fabian analyzed data of the SR2 suspension decay times with the control system on. Almost done but no plot to show yet.
  • On Thursday I helped Ushiba-san and Yokozawa-san to measure the BS oplev QPDs dark noise. See klog entry 14473.

  • No questions about inertial damping today.

Type-Bp

Type-C

Controls

  • Type-A modeling (Shoda)
    • (for the paper) Searching for the fastest way to derive the theoretical spring constant of the actual HLs.
    • (for the cryo-p evaluation) The RT model is updated. Need update of the actuation efficiency.

Electronics

  • Started measurements of the circuits. It takes much time due to many variations of inductor.

Post O3

  • More activities in the control room and the site became available from June 1st (Noise budget measurement by Ushiba).
  • O3c has not been decided yet, but the situation is going to O4 directly.
  • The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
  • Tasks on electronics should be combined to the task list towards O4.
  • Procedure of the wire gluing should be confirmed beforehand.
  • Schedule including the commissioning should be considered, but overall plan and schedule, which will be discussed in the next SEO/Chief meeting, are necessary to make detail schedule.

Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/12(Fri)