Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2020-06-11 10:02:55
Size: 1349
Comment:
Revision 10 as of 2020-06-12 14:03:03
Size: 2529
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
Participants:  Participants:
Line 10: Line 10:
 * Miyo made VIS_COILOUT_ALERT.mdl to alert us when the output signal reach to maximum count of DAC. If the signal above 30% of the max, text is colored by yellow, and if above 70% it colored by red. simple. This work was posted on [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14485|klog#14485]].
Line 12: Line 14:
 * The decay times measurement were finished. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14510|14510]] for details.
 * As preparation for the control upgrade next week Miyo-kun and Fabian will modify the Type-B real-time model. It seems the modification is simple enough to do it remotely and we will ask Nakano-kun to restart the model after compilation. It only implies copying, pasting and renaming a few blocks. We received advice from Yamamoto-kun about the status of the connection of the IXV seismometer to the Dolphin network via the LSC model.
 * Writing of the Type-B paper continues.
Line 15: Line 21:
 * There is a wiki page with the plan agreed on Friday: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/OpsManual/TypeB/ControlWork01|control upgrade wiki page]].
 * FTE analysis of heat link is on going. About to implement it into the suns model.
Line 16: Line 25:
Line 18: Line 26:
 * Post Obs. tasks are on going. Decay time measurement in SR2 was performed. Sensor correction for SRs and SR suspension update are planed in the next week.  * Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
Line 21: Line 29:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Revised schedule towards O4]]
 * [[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|Revised task list towards O4]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Revised schedule towards O4]].
 * [[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|Revised task list towards O4]].
Line 24: Line 32:
cf.: Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]). cf. Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).

Agenda/Minutes of the VIS Meeting on 2020/6/12

2020/6/12 14:00 -

Zoom Meeting

Participants:

Progress report

General

  • Miyo made VIS_COILOUT_ALERT.mdl to alert us when the output signal reach to maximum count of DAC. If the signal above 30% of the max, text is colored by yellow, and if above 70% it colored by red. simple. This work was posted on klog#14485.

Type-A

Type-B

  • The decay times measurement were finished. See klog 14510 for details.

  • As preparation for the control upgrade next week Miyo-kun and Fabian will modify the Type-B real-time model. It seems the modification is simple enough to do it remotely and we will ask Nakano-kun to restart the model after compilation. It only implies copying, pasting and renaming a few blocks. We received advice from Yamamoto-kun about the status of the connection of the IXV seismometer to the Dolphin network via the LSC model.
  • Writing of the Type-B paper continues.

Type-Bp

Type-C

Controls

  • There is a wiki page with the plan agreed on Friday: control upgrade wiki page.

  • FTE analysis of heat link is on going. About to implement it into the suns model.

Electronics

Post O3

  • Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • O3c has not been decided yet, but the situation is going to O4 directly.
  • The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
  • Revised schedule towards O4.

  • Revised task list towards O4.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/17(Fri)