Line 6: Line 6:
Participants:  Participants:
Line 12: Line 12:
 * The decay times measurement were finished. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14510|14510]] for details.
Line 16: Line 18:
Line 18: Line 19:
 * Post Obs. tasks are on going. Decay time measurement in SR2 was performed. Sensor correction for SRs and SR suspension update are planed in the next week.  * Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
Line 21: Line 22:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Revised schedule towards O4]]
 * [[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|Revised task list towards O4]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Revised schedule towards O4]].
 * [[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|Revised task list towards O4]].
Line 24: Line 25:
cf.: Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]). cf. Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).

Agenda/Minutes of the VIS Meeting on 2020/6/12

2020/6/12 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • The decay times measurement were finished. See klog 14510 for details.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • O3c has not been decided yet, but the situation is going to O4 directly.
  • The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
  • Revised schedule towards O4.

  • Revised task list towards O4.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/17(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200612 (last edited 2020-06-12 17:02:27 by RyutaroTakahashi)