Agenda/Minutes of the VIS Meeting on 2020/6/12

2020/6/12 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • The decay times measurement were finished. See klog 14510 for details.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • O3c has not been decided yet, but the situation is going to O4 directly.
  • The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
  • Revised schedule towards O4.

  • Revised task list towards O4.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/17(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200612 (last edited 2020-06-12 17:02:27 by RyutaroTakahashi)