Agenda/Minutes of the VIS Meeting on 2020/6/12

2020/6/12 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • The decay times measurement were finished. See klog 14510 for details.

  • As preparation for the control upgrade next week Miyo-kun and Fabian will modify the Type-B real-time model. It seems the modification is simple enough to do it remotely and we will ask Nakano-kun to restart the model after compilation. It only implies copying, pasting and renaming a few blocks. We received advice from Yamamoto-kun about the status of the connection of the IXV semsometer to the Dolphin network via the LSC model.
  • Writing of the Type-B paper continues.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Decay time measurement in SR2 was performed in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • O3c has not been decided yet, but the situation is going to O4 directly.
  • The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
  • Revised schedule towards O4.

  • Revised task list towards O4.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/17(Fri)