Agenda/Minutes of the VIS Meeting on 2020/6/12
2020/6/12 14:00 -
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Post O3
- Post Obs. tasks are on going. Decay time measurement in SR2 was performed. Sensor correction for SRs and SR suspension update are planed in the next week.
- O3c has not been decided yet, but the situation is going to O4 directly.
- The site work towards O4 is rescheduled. The extended chief meeting will be held on June 15th to discuss about the plan towards O4.
cf.: Post Obs. task (Request), Task for O3c (Plan, Sheet).
Safety
Discussion
Travel Plans
Next meeting
- On 2020/6/17(Fri)