Differences between revisions 1 and 2
Revision 1 as of 2020-06-18 09:46:35
Size: 1401
Comment:
Revision 2 as of 2020-06-18 09:58:14
Size: 1560
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11758|Proposal]] on VIS commissioning was shown in the extended chief meeting.

Agenda/Minutes of the VIS Meeting on 2020/6/19

2020/6/19 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Real-time model was modified in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • The extended chief meeting was held on 15th. DRFPMI commissioing was scheduled in Jul.-Aug. The tasks towards O4 will be started from Sep.
  • Proposal on VIS commissioning was shown in the extended chief meeting.

  • "Remote/onsite support on VIS troubles by VIS group members with shift style" is requested for the DRFPMI commissioing.
  • Revised schedule towards O4.

  • Revised task list towards O4.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/26(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200619 (last edited 2020-06-19 15:15:23 by RyutaroTakahashi)