Agenda/Minutes of the VIS Meeting on 2020/6/19

2020/6/19 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Real-time model was modified in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • The extended chief meeting was held on 15th. DRFPMI commissioing was scheduled in Jul.-Aug. The tasks towards O4 will be started from Sep.
  • Proposal on suspension commissioning was shown in the extended chief meeting.

  • "Remote/onsite support on VIS troubles by VIS group members with shift style" is requested for the DRFPMI commissioing.
  • Schedule towards O4 was revised again.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

  • Correction of concerned topics for the evaluation meeting.

Travel Plans

Next meeting

  • On 2020/6/26(Fri)