Agenda/Minutes of the VIS Meeting on 2020/6/19
2020/6/19 14:00 -
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Post O3
- Post Obs. tasks are on going. Real-time model was modified in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
- The extended chief meeting was held on 15th. DRFPMI commissioing was scheduled in Jul.-Aug. The tasks towards O4 will be started from Sep.
Proposal on suspension commissioning was shown in the extended chief meeting.
- "Remote/onsite support on VIS troubles by VIS group members with shift style" is requested for the DRFPMI commissioing.
Schedule towards O4 was revised again.
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).
Safety
Discussion
Correction of concerned topics for the evaluation meeting on 22nd (google spreadsheet).
Travel Plans
Next meeting
- On 2020/6/26(Fri)