Line 2: Line 2:
2020/6/19 14:00 -  2020/6/19 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 12: Line 12:
 * For SR baffle installation I checked the mirror height reference marks done by Terada-san. They are still there. See klog report [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14573|14573]].

Agenda/Minutes of the VIS Meeting on 2020/6/19

2020/6/19 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • For SR baffle installation I checked the mirror height reference marks done by Terada-san. They are still there. See klog report 14573.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Real-time model was modified in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • The extended chief meeting was held on 15th. DRFPMI commissioing was scheduled in Jul.-Aug. The tasks towards O4 will be started from Sep.
  • Proposal on suspension commissioning was shown in the extended chief meeting.

  • "Remote/onsite support on VIS troubles by VIS group members with shift style" is requested for the DRFPMI commissioing.
  • Schedule towards O4 was revised again.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/26(Fri)