Differences between revisions 9 and 10
Revision 9 as of 2020-06-19 11:37:58
Size: 2435
Comment:
Revision 10 as of 2020-06-19 11:39:17
Size: 2489
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * I checked the UGF to be 85 mHz. Being lower than 406 mHz it should not affect such mode according to certain expectations. Still, I put a notch (f=406 mHz, Q=10 and depth 40 dB) and repeated the measurement. '''The decay time with the control off decresed by 40 seconds'''.   * I checked the UGF to be 85 mHz. Being lower than 406 mHz it should not have an affect according to certain expectations. The OLTF gain at such frequency was 0.22. Still, I put a notch (f=406 mHz, Q=10 and depth 40 dB) in the filter and repeated the measurement. '''The decay time with the control on decreased by 40 seconds'''.

Agenda/Minutes of the VIS Meeting on 2020/6/19

2020/6/19 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • For SR baffle installation I checked the mirror height reference marks done by Terada-san. They are still there. See klog report 14573.

  • SR2 decay times: following the issue of the mode IP-L 406 mHz, whose damping time was 35 seconds longer with the control system on (klog entry 14510)

    • I checked the UGF to be 85 mHz. Being lower than 406 mHz it should not have an affect according to certain expectations. The OLTF gain at such frequency was 0.22. Still, I put a notch (f=406 mHz, Q=10 and depth 40 dB) in the filter and repeated the measurement. The decay time with the control on decreased by 40 seconds.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Real-time model was modified in this week. Sensor correction for SRs and SR suspension update are planed in the next week.
  • The extended chief meeting was held on 15th. DRFPMI commissioing was scheduled in Jul.-Aug. The tasks towards O4 will be started from Sep.
  • Proposal on suspension commissioning was shown in the extended chief meeting.

  • "Remote/onsite support on VIS troubles by VIS group members with shift style" is requested for the DRFPMI commissioing.
  • Schedule towards O4 was revised again.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/26(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200619 (last edited 2020-06-19 15:15:23 by RyutaroTakahashi)