Size: 1782
Comment:
|
Size: 2077
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
* We should decide which suspensions will require the heaters. | * We should decide which suspensions will require the heaters: maybe SRM and SR2 (Fabian should check). * Policy of temperature control during the time in which VIS worl will take place: according to what Fabian understood from Miyoki-san, now that there are enough coolers the aim is to keep it to about 23.5 degrees, but we should ask for conformation. |
Agenda/Minutes of the VIS Meeting on 2020/6/26
2020/6/26 14:00 -
Participants:
Progress report
General
I started to prepare the heater jackets for temperature control of GAS. This project doesn't have a time schedule. We have to discuss. (Github Issue)
- We should decide which suspensions will require the heaters: maybe SRM and SR2 (Fabian should check).
- Policy of temperature control during the time in which VIS worl will take place: according to what Fabian understood from Miyoki-san, now that there are enough coolers the aim is to keep it to about 23.5 degrees, but we should ask for conformation.
Type-A
(Takahashi) Tested the accelerometer with the LVDT prototype (Slide).
Type-B
Type-Bp
Type-C
Controls
Type-A modeling : brief report
Electronics
Post O3
- Post Obs. tasks are on going. Decay time measurements were carried out again. RT model modification for other Type-Bs is planed in this weekend. Sensor correction for SRs and SR suspension update will be started from July.
- O3c will be canceled.
Task towards O4 (List) was revised.
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Schedule towards O4 (Chart).
Safety
Discussion
Travel Plans
Next meeting
- On 2020/7/3(Fri)