Line 13: | Line 13: |
* PR models are updated to have control loop for PSD in MISALIGNED state. * At that time, PRs tripped due to the model restart failure. * There was a trouble that the burt file was properly loaded, and optic was too away from the linear range to turn on the control without DC offset. |
|
Line 24: | Line 27: |
* Acceptance Test. * Confirmation of ducts and flanges to be opened. |
* Acceptance Test ([[https://paper.dropbox.com/doc/Acceptance-Test-Y8XaTLUcQ6oP0EfmSSLZ8|Items]]). * Bellows and flanges to be opened ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11787|List]]). |
Agenda/Minutes of the VIS Meeting on 2020/7/3
2020/7/3 14:00 -
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
- PR models are updated to have control loop for PSD in MISALIGNED state.
- At that time, PRs tripped due to the model restart failure.
- There was a trouble that the burt file was properly loaded, and optic was too away from the linear range to turn on the control without DC offset.
Type-C
Controls
Electronics
Post O3
- Post Obs. tasks are still on going. RT model modification for SRs was carried out. Sensor correction for SRs and SR suspension update are planed in the next week.
Schedule towards O4 (Chart) was revised.
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).
Safety
Discussion
Travel Plans
- Takahashi (7/14-16)
Next meeting
- On 2020/7/10(Fri)