Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2020-07-02 09:35:46
Size: 1229
Comment:
Revision 5 as of 2020-07-02 13:49:03
Size: 1400
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
 * Acceptance Test.
 * Bellows and flanges to be opened.
 * Acceptance Test ([[https://paper.dropbox.com/doc/Acceptance-Test-Y8XaTLUcQ6oP0EfmSSLZ8|Items]]).
 * Bellows and flanges to be opened ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11787|List]]).

Agenda/Minutes of the VIS Meeting on 2020/7/3

2020/7/3 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are still on going. RT model modification for SRs was carried out. Sensor correction for SRs and SR suspension update are planed in the next week.
  • Schedule towards O4 (Chart) was revised.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

  • Acceptance Test (Items).

  • Bellows and flanges to be opened (List).

Travel Plans

  • Takahashi (7/14-16)

Next meeting

  • On 2020/7/10(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200703 (last edited 2020-07-03 15:47:36 by RyutaroTakahashi)