Differences between revisions 5 and 6
Revision 5 as of 2020-07-02 13:49:03
Size: 1400
Comment:
Revision 6 as of 2020-07-03 09:52:04
Size: 1693
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * PR models are updated to have control loop for PSD in MISALIGNED state.
  * At that time, PRs tripped due to the model restart failure.
  * There was a trouble that the burt file was properly loaded, and optic was too away from the linear range to turn on the control without DC offset.

Agenda/Minutes of the VIS Meeting on 2020/7/3

2020/7/3 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

  • PR models are updated to have control loop for PSD in MISALIGNED state.
    • At that time, PRs tripped due to the model restart failure.
    • There was a trouble that the burt file was properly loaded, and optic was too away from the linear range to turn on the control without DC offset.

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are still on going. RT model modification for SRs was carried out. Sensor correction for SRs and SR suspension update are planed in the next week.
  • Schedule towards O4 (Chart) was revised.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

  • Acceptance Test (Items).

  • Bellows and flanges to be opened (List).

Travel Plans

  • Takahashi (7/14-16)

Next meeting

  • On 2020/7/10(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200703 (last edited 2020-07-03 15:47:36 by RyutaroTakahashi)