Line 2: Line 2:
2020/7/31 14:00 -  2020/7/31 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 18: Line 18:
 * The accelerometer with LVDT was tested at the site ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14809|report]]).  * The accelerometer with LVDT was tested at the site ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14809|klog]]).
  * The ACC was set on the floor of IYV area. The folded pendulum was tuned to 0.24Hz. The servo loop was configured by Miyo-san using KAGRA digital system.
  * When we finished the final setting on Wednesday afternoon, the large earthquake (M7.8) was happened at Aleutian islands. So Miyo-san measured and evaluated the spectrum later.
 * Offload the ITMX_GAS_F1,2 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14820|klog#14820]]
Line 20: Line 24:
 * Paper: I finished writing. I'm waiting for Enzo's comments to submit to CPC and share it with the rest of VIS people.
Line 24: Line 30:
Line 27: Line 32:
 * Plan for cleaning the clean booth ([[https://paper.dropbox.com/doc/Plan-for-cleaning-the-clean-booth--A4sGiR7q0t~ATPPMgzazDyn0Ag-KVEbnCCBASYy4ea78HBUH|EN]], [[https://paper.dropbox.com/doc/--A4vk7QtUSYgLTfj6KCTgmNGfAg-uBycxL7qBXnDbLNBDGpZH|JP]]) will be submitted by 3rd. Aug. It is necessary to make the inventory with location ([[https://www.dropbox.com/s/uz1ial5r377dgvt/%E5%9D%91%E5%86%85%E3%80%81%E5%88%86%E5%AE%A4Inventory%20check.xlsx?dl=0|example for Type-A]]).
 * Preparation work (pre-cleaning) will be started from 17th Sep.
 * Plan for cleaning the clean booth ([[https://paper.dropbox.com/doc/Plan-for-cleaning-the-clean-booth--A4sGiR7q0t~ATPPMgzazDyn0Ag-KVEbnCCBASYy4ea78HBUH|EN]], [[https://paper.dropbox.com/doc/--A4vk7QtUSYgLTfj6KCTgmNGfAg-uBycxL7qBXnDbLNBDGpZH|JP]]) will be submitted by 3rd. Aug. It is necessary to make the inventory with location ([[https://www.dropbox.com/s/uz1ial5r377dgvt/坑内、分室Inventory%20check.xlsx?dl=0|example for Type-A]]).
  * [Washimi] PEM team introduce the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11806|Holobuilder]] (Google street view like tool). Let's discuss about cleanup plan with this tool.
 
* Preparation work (pre-cleaning) will be started from 17th Sep. [[attachment:Cleaning schedule.png]].
Line 33: Line 39:
 * [Washimi] Room temperature and GAS status [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/fig_GAS/]]  * [Washimi] Room temperature and GAS status https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/fig_GAS/
  * The temperature in mine dropped during July 9th - July 19th (-0.8degC). We couldn't find this until July 22th due to the trouble and maintenance of the network.
  * We added 2 heaters on July 28th.
Line 36: Line 44:
 * [Washimi] PEM team introduce the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11806|Holobuilder]] (Google street view like tool). Let's discuss about cleanup plan with this tool.

Agenda/Minutes of the VIS Meeting on 2020/7/31

2020/7/31 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

  • The accelerometer with LVDT was tested at the site (klog).

    • The ACC was set on the floor of IYV area. The folded pendulum was tuned to 0.24Hz. The servo loop was configured by Miyo-san using KAGRA digital system.
    • When we finished the final setting on Wednesday afternoon, the large earthquake (M7.8) was happened at Aleutian islands. So Miyo-san measured and evaluated the spectrum later.
  • Offload the ITMX_GAS_F1,2 klog#14820

Type-B

  • Paper: I finished writing. I'm waiting for Enzo's comments to submit to CPC and share it with the rest of VIS people.

Type-Bp

Type-C

Controls

Electronics

Towards O4

  • KAGRA is in "Upgrade phase for O4". Upgrade of SR controls were performed. The accelerometer with LVDT was tested at the site.
  • Plan for cleaning the clean booth (EN, JP) will be submitted by 3rd. Aug. It is necessary to make the inventory with location (example for Type-A).

    • [Washimi] PEM team introduce the Holobuilder (Google street view like tool). Let's discuss about cleanup plan with this tool.

  • Preparation work (pre-cleaning) will be started from 17th Sep. Cleaning schedule.png.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).

Safety

  • [Washimi] Room temperature and GAS status https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/fig_GAS/

    • The temperature in mine dropped during July 9th - July 19th (-0.8degC). We couldn't find this until July 22th due to the trouble and maintenance of the network.
    • We added 2 heaters on July 28th.

Discussion

Travel Plans

Next meeting

  • On 2020/8/7(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200731 (last edited 2020-07-31 15:40:25 by RyutaroTakahashi)