2020/8/7 14:00 -  2020/8/7 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 10: Line 10:
 * [Miyo] by 08/28/2020?, 20% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/13|Make a cabling diagram for O4]]
 * [Miyo] by 08/28/2020?, 25% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/20|Make prototype system for temperature control]]
 * [Miyo] by 08/28/2020?, 20% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/22|Enable to control the limit switch of stepper motor]]
 * [Miyo] by 08/28/2020?, 0% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/23|Request AEL chassis for picomotor driver]]
 * [Miyo] by 08/28/2020?, 0% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/24|Update remote control system]]
 * [Miyo] by 08/28/2020?, 0% done (+0%), [[https://github.com/gw-vis/kagra-vis/issues/25|Add CRY stepper motor in the remote control system]]
Line 11: Line 18:
 * [Miyo] [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14861|Installed the Prequa system in TypeA]]
  * Installation was finished.
  * Now I try to diagonalize sensors and balance actuators by using the Prequa system.
  * I will do the modal damping on TypeA suspensions after the initialization work for sensors and actuators. (Next week)
Line 12: Line 24:
 * On Monday I submitted the paper to CPC: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11860|JGW-P2011860]].
 * Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14875|14875]].
Line 13: Line 28:
 * Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14876|14876]].
Line 16: Line 33:
Line 19: Line 35:
 * Confirmation of personnel.
  * Type-A: Takahashi, Sato, Miyo, + Company
  * Type-B/Bp: Shoda(S), Hirata, Fabian, Washimi, + Company
 * Confirmation of personnel at the site.
  * Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr)
  * Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec)
 * Procedure documents are required by SEO.
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]]
  * Wire gluing in PR3 (by Shoda)
  * Filter height adjustment in Type-B (by Fabian)
 * Schedule towards O4 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]) was revised.
Line 23: Line 45:
cf. Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]), Task towards O4 ([[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|List]]), Schedule towards O4 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]). cf. Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]), Task towards O4 ([[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|List]]).
Line 29: Line 51:
 * On 2020/8/28(Fri)  * On 2020/8/19(Wed)?

Agenda/Minutes of the VIS Meeting on 2020/8/7

2020/8/7 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

  • [Miyo] Installed the Prequa system in TypeA

    • Installation was finished.
    • Now I try to diagonalize sensors and balance actuators by using the Prequa system.
    • I will do the modal damping on TypeA suspensions after the initialization work for sensors and actuators. (Next week)

Type-B

  • On Monday I submitted the paper to CPC: JGW-P2011860.

  • Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog 14875.

Type-Bp

  • Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog 14876.

Type-C

Controls

Electronics

Towards O4

  • KAGRA is in "Upgrade phase for O4". PreQua system was implemented to the Type-A.

  • Confirmation of personnel at the site.
    • Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr)
    • Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec)
  • Procedure documents are required by SEO.
  • Schedule towards O4 (Chart) was revised.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/8/19(Wed)?