Size: 1189
Comment:
|
Size: 2054
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/8/7 14:00 - | 2020/8/7 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 12: | Line 12: |
* On Monday I submitted the paper to CPC: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11860|JGW-P2011860]]. * Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14875|14875]]. |
|
Line 13: | Line 16: |
* Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14876|14876]]. |
|
Line 16: | Line 21: |
Line 19: | Line 23: |
* Confirmation of personnel. * Type-A: Takahashi, Sato, Miyo, + Company * Type-B/Bp: Shoda(S), Hirata, Fabian, Washimi, + Company |
* Confirmation of personnel at the site. * Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr) * Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec) * Procedure documents are required by SEO. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * Wire gluing in PR3 (by Shoda) * Filter height adjustment in Type-B (by Fabian) |
Line 29: | Line 38: |
* On 2020/8/28(Fri) | * On 2020/8/19(Wed)? |
Agenda/Minutes of the VIS Meeting on 2020/8/7
2020/8/7 14:00 -
Participants:
Progress report
General
Type-A
Type-B
On Monday I submitted the paper to CPC: JGW-P2011860.
Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog 14875.
Type-Bp
Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog 14876.
Type-C
Controls
Electronics
Towards O4
KAGRA is in "Upgrade phase for O4". PreQua system was implemented to the Type-A.
- Confirmation of personnel at the site.
- Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr)
- Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec)
- Procedure documents are required by SEO.
- Wire gluing in PR3 (by Shoda)
- Filter height adjustment in Type-B (by Fabian)
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).
Safety
Discussion
Travel Plans
Next meeting
- On 2020/8/19(Wed)?